Monitoring of the BTA Deep Hole Drilling Process Using Residual Control Charts

dc.contributor.authorHering, Franzde
dc.contributor.authorMessaoud, Amorde
dc.contributor.authorTheis, Winfriedde
dc.date.accessioned2004-12-29T10:59:52Z
dc.date.available2004-12-29T10:59:52Z
dc.date.issued2004de
dc.description.abstractDeep hole drillingmetho ds are used for producingho les with a high length-to-diameter ratio, good surface finish and straightness. The process is subject to dynamic disturbances usually classified as either chatter vibration or spiralling. In this work, we propose to monitor the BTA drillingpr ocess usingco ntrol charts to detect chatter as early as possible and to secure production with high quality. These control charts use the residuals obtained from a model which describes the variation in the amplitude of the relevant frequencies of the process. The results showed that chatter is detected and some alarm signals are related to changing physical conditions of the process.en
dc.identifier.urihttp://hdl.handle.net/2003/19652
dc.identifier.urihttp://dx.doi.org/10.17877/DE290R-15675
dc.language.isoende
dc.publisherUniversität Dortmundde
dc.subject.ddc000de
dc.titleMonitoring of the BTA Deep Hole Drilling Process Using Residual Control Chartsen
dc.typeTextde
dc.type.publicationtypereporten
dcterms.accessRightsopen access

Files

Original bundle
Now showing 1 - 2 of 2
No Thumbnail Available
Name:
tr60-04.ps
Size:
15.55 MB
Format:
Postscript Files
Loading...
Thumbnail Image
Name:
tr60-04.pdf
Size:
341.14 KB
Format:
Adobe Portable Document Format
Description:
DNB