Title: Energy System Modelling: Power Plant Dispatch and Electricity Generation Costs
Language (ISO): en
Abstract: The growing share of intermittent renewable energy on the electricity production has also an influence on the remaining thermal power plants. The full load hours, especially of fossil fired power plants, are decreasing over time. In the meantime, the energy surplus produced by renewable sources is increasing and without building new controllable power plants, the back-up capacity is decreasing because old fossil fired power plants will shut down. A lot of modelling has been done in this field yielding to very different results. This paper shows a generic approach to the calculation of the power plant dispatch and the electricity generation cost. The main focus is on the influence different scenario assumptions can have on the outcome of the investigation. The aim is to show how important an extensive sensitivity analyses is. As the ambitious climate targets of the government, the strong development of intermittent renewable energies as well as the nuclear phase out provide very good scenarios, the model will be explained on the example of Germany.
Subject Headings: renewable energy
energy storage
electricity generation costs
power plant dispatch
URI: http://hdl.handle.net/2003/33968
http://dx.doi.org/10.17877/DE290R-7740
Issue Date: 2015-01-14
Is part of: Power and Energy Student Summit(PESS) 2015, January 13th-14th, Dortmund Germany
Appears in Collections:Power and Energy Student Summit (PESS) 2015

Files in This Item:
File Description SizeFormat 
P02.3.pdfDNB902.49 kBAdobe PDFView/Open


This item is protected by original copyright



This item is protected by original copyright rightsstatements.org