Authors: Hering, Franz
Messaoud, Amor
Theis, Winfried
Weihs, Claus
Title: Application and Use of Multivariate Control Charts in a BTA Deep Hole Drilling Process
Language (ISO): en
Abstract: Deep hole drilling methods are used for producing holes with a high length-to-diameter ratio, good surface finish and straightness. The process is subject to dynamic disturbances usually classified as either chatter vibration or spiralling. In this paper, we will focus on the application and use of multivariate control charts to monitor the process in order to detect chatter vibrations. The results showed that chatter is detected and some alarm signals occurs at time points which can be connected to physical changes of the process.
URI: http://hdl.handle.net/2003/4901
http://dx.doi.org/10.17877/DE290R-5307
Issue Date: 2004
Provenance: Universitätsbibliothek Dortmund
Appears in Collections:Sonderforschungsbereich (SFB) 475

Files in This Item:
File Description SizeFormat 
30_04.pdfDNB509.96 kBAdobe PDFView/Open
tr30-04.ps371.48 kBPostscriptView/Open


This item is protected by original copyright



This item is protected by original copyright rightsstatements.org